You are currently here!
  • Home
  • EMC D-PSC-MN-01 Free EMC D-PSC-MN-01 Study Guides Exam Questions & Answer [Q31-Q45]

Free EMC D-PSC-MN-01 Study Guides Exam Questions & Answer [Q31-Q45]

January 25, 2025 latestexam 0 Comments
Rate this post

Free EMC D-PSC-MN-01 Study Guides Exam Questions and Answer

D-PSC-MN-01 Exam Dumps, D-PSC-MN-01 Practice Test Questions

NEW QUESTION 31
Which action is critical when preparing the site for a PowerScale installation?

 
 
 
 

NEW QUESTION 32
What is the impact of network misconfiguration on a PowerScale cluster?

 
 
 
 

NEW QUESTION 33
What is the maximum recommended ambient temperature for the operation of a Dell EMC PowerScale Gen 6 node?

 
 
 
 

NEW QUESTION 34
A node has been removed from a Dell PowerScale cluster running OneFS 9.0.
Which PowerScale feature redistributes data across the remaining nodes?

 
 
 
 

NEW QUESTION 35
Which cluster interface provides the most detailed network traffic statistics and enables file and directory operations on the cluster?

 
 
 
 

NEW QUESTION 36
In PowerScale hardware maintenance, why is it essential to track the installation and maintenance of FRUs?

 
 
 
 

NEW QUESTION 37
Which network configurations are valid on a Dell PowerScale Gen 6 cluster that uses an Ethernet backend?

 
 
 
 

NEW QUESTION 38
A client plans to reconnect to a cluster automatically without Interruption.
Which two upgrade methods can be used to complete the upgrade while file service is still available to the client?

 
 
 
 

NEW QUESTION 39
Before replacing any CRUs in a PowerScale node, what is an important safety measure?

 
 
 
 

NEW QUESTION 40
Refer to the exhibit.

A platform engineer has connected power cables to a Dell EMC PowerScale.

 
 
 
 

NEW QUESTION 41
The SSD has failed in a Dell EMC PowerScale H400 node that has one SSD installed. A technician is asked to replace it.
Where should the new drive be installed?

 
 
 
 

NEW QUESTION 42
An SSD has failed in Node 1 in a Dell EMC PowerScale F200 cluster. After replacing the drive, which command should be run to ensure the node has finished updating?

 
 
 
 

NEW QUESTION 43
A Dell EMC PowerScale platform engineer is asked to reimage a node.
What should they check before they start the reimage process?

 
 
 
 

NEW QUESTION 44
What are the essential phases in the PowerScale installation process?

 
 
 
 

NEW QUESTION 45
A platform engineer is installing a Dell EMC PowerScale cluster with 12 F200 nodes.
What is the correct ratio used for the breakout cable?

 
 
 
 

Latest D-PSC-MN-01 Actual Free Exam Questions Updated 150 Questions: https://www.latestcram.com/D-PSC-MN-01-exam-cram-questions.html

leave a comment

Enter the text from the image below