You are currently here!
  • Home
  • SAP C-TS422-2020 [Aug 11, 2022] Reliable C-TS422-2020 Exam Tips Test Pdf Exam Material [Q18-Q39]

[Aug 11, 2022] Reliable C-TS422-2020 Exam Tips Test Pdf Exam Material [Q18-Q39]

August 11, 2022 latestexam 0 Comments
Rate this post

[Aug 11, 2022] Reliable C-TS422-2020 Exam Tips Test Pdf Exam Material

New 2022 C-TS422-2020 Test Tutorial (Updated 150 Questions)

C-TS422-2020 Exam Certification Details:

Level: Associate
Cut Score: 56%
Duration: 180 mins

SAP S/4HANA Production Planning and Manufacturing Certification Exam Topics:

Topic Areas Topic Details, Courses, Books Weighting
Introduction to SAP S/4HANA Supply Chain Planning Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4200 (SAP S/4HANA 2020)

< 8%
Master Data in SAP S/4HANA Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4210 (SAP S/4HANA 2020)

> 12%
Capacity Planning in SAP S/4HANA Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4230 (SAP S/4HANA 2020)

8% – 12%
Demand Management in SAP S/4HANA Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4220 (SAP S/4HANA 2020)

< 8%
Lean Manufacturing in SAP S/4HANA Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4200 (SAP S/4HANA 2020)

8% – 12%

 

NEW QUESTION 18
You want to perform capacity availability checks on your production orders. What must be set for this to occur? Note: Thereare 2 correct answers to this question.

 
 
 
 

NEW QUESTION 19
Which material master data can you copy when you use the Copy Material program (transaction MMCC, Material Master Copier) to create new materials? There are 2 correct answers to this question.

 
 
 
 

NEW QUESTION 20
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA.
When can you use mode selection?

 
 
 
 

NEW QUESTION 21
When do you use variant bills of materials (BOMB)?

 
 
 
 

NEW QUESTION 22
What is the first step in the MRP run?

 
 
 
 

NEW QUESTION 23
Where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 correct answers to this question.

 
 
 
 
 

NEW QUESTION 24
What are drawbacks of the separation of OLTP and OLAP? There are 4 correct answers to this question.

 
 
 
 
 

NEW QUESTION 25
Your project team decides to use a make-to-order planning strategy for a strategic material in discretemanufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.

 
 
 
 
 

NEW QUESTION 26
How can SAP S/4HANA support a GMP compliant production process? Note: There are 3 correct answers tothis question.

 
 
 
 
 

NEW QUESTION 27
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?

 
 
 
 

NEW QUESTION 28
What is the difference between co-products and by-products?

 
 
 
 

NEW QUESTION 29
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks?

 
 
 
 

NEW QUESTION 30
In Make-to-order production, which field controls whether the components will be planned as sales order specific stock?

 
 
 
 

NEW QUESTION 31
Which technological advances enabled the development of SAP S/4HANA as the digital core?
There are 3 correct answers to this question.

 
 
 
 
 

NEW QUESTION 32
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. Whatdetermines whether the storage location can be derived from the production version?

 
 
 
 

NEW QUESTION 33
In which data objects do you maintain the production in as the work center for repetitive manufacturing?
There are 2 correct answers to this question.

 
 
 
 

NEW QUESTION 34
What are properties of MRP Live? There are 2 correct answers to this question.

 
 
 
 

NEW QUESTION 35
What are the key aspects of SAP S/4HANA? There are 2 correct answers to this question.

 
 
 
 

NEW QUESTION 36
What determines whether the planned independent requirements in MRP consume other requirements?

 
 
 
 

NEW QUESTION 37
What are some uses for the low-level code assigned to each material? Note: There are 2correct answers to this question.

 
 
 
 

NEW QUESTION 38
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.

 
 
 
 
 

NEW QUESTION 39
For what production type are production orders used?

 
 
 
 