You are currently here!
  • Home
  • USGBC LEED-AP-BD-C Real LEED-AP-BD-C dumps Accurate Questions and Answers with Free and Fast Updates [Q172-Q187]

Real LEED-AP-BD-C dumps Accurate Questions and Answers with Free and Fast Updates [Q172-Q187]

January 16, 2025 latestexam 0 Comments
Rate this post

Real LEED-AP-BD-C dumps Accurate Questions and Answers with Free and Fast Updates

Real LEED-AP-BD-C Quesions Pass Certification Exams Easily

USGBC LEED-AP-BD-C Exam Syllabus Topics:

Topic Details
Topic 1
  • Sustainable Sites: It covers site assessment and planning that involves evaluating various site characteristics, such as topography, hydrology, climate, vegetation, and soil conditions. It also covers assessing a site’s potential as a resource for energy flows while addressing construction activity pollution prevention measures.
Topic 2
  • Indoor Environmental Quality: This domain measures the skills of LEED Green Associates in creating healthy indoor environments. It emphasizes the importance of maintaining adequate ventilation levels through both natural and mechanical means. Additionally, candidates will be assessed on topics such as tobacco smoke control measures.
Topic 3
  • Location and Transportation: This topic measures the skills of LEED Green Associates in sustainable development. It addresses critical factors in site selection, including development constraints and opportunities related to environmental considerations, and community connectivity concepts, such as walkability and street design, which are vital for promoting sustainable transportation options.
Topic 4
  • Energy and Atmosphere: In this topic, LEED Green Associates focuses on building reuse, including historic building renovations. It covers material reuse strategies, enclosure materials, and permanently installed interior components into new designs.
Topic 5
  • Project Surroundings and Public Outreach: LEED Green Associates learn about promoting sustainable practices, regional design considerations that incorporate green construction measures, cultural awareness issues related to historic or heritage impacts, and ensuring that sustainability efforts are respectful of local values.

 

NO.172 How is the distance between the project site and the manufacturing location determined for Materials and Resources Credit. Building Disclosure and Optimization – Sourcing of Raw Materials. Option 2. Leadership Extraction Practices?

 
 
 
 

NO.173 Which of the following is a source reduction strategy to eliminate waste produced by a project?

 
 
 
 

NO.174 A newly constructed school has installed solar thermal systems and wind turbines on site. To achieve the maximum number of Energy and Atmosphere points, which team members must be included?

 
 
 
 

NO.175 A LEED AP is evaluating whether Indoor Environmental Quality Credit, Acoustic Performance is feasible for a LEED AP Building Design and Construction: Healthcare project. Which of the following groups of documents would best inform this decision?

 
 
 
 

NO.176 Landscape irrigation practices consume large quantities of potable water. By evaluating the project’s outdoor water budget and irrigation water demand early in the design process in Water Efficiency Prerequisite, Outdoor Water Use Reduction project teams will be able to

 
 
 
 

NO.177 In Sustainable Sites Credit, Light Pollution Reduction, which factor is included in the lamp lumen uplight calculation?

 
 
 
 

NO.178 Which of the following is true regarding LEED Pilot Credits?

 
 
 
 

NO.179 Sustainable Sites Credit, Site Assessment requires evaluation of

 
 
 
 

NO.180 What supporting material is required for all LEED Building Design and Construction projects in order to document Location and Transportation Credit, Bicycle Facilities for the bicycle network?

 
 
 
 

NO.181 A project will renovate a building with historic designation into new office space. The surface area of the existing building structure and envelope is 100,000 ft² (9,290 m²). How much of the existing building will need to be reused to earn 5 points for the Materials and Resource Credit, Building Life-Cycle Impact Reduction?

 
 
 
 

NO.182 Under the Building Design and Construction rating systems, projects can opt for a review process that helps teams determine if the project is on track to achieve LEED certification at its preferred level. This process is referred to as

 
 
 
 

NO.183 Which of the following pairs of strategies can help reduce the landscape water demand beyond the prerequisite level in Water Efficiency Credit, Outdoor Water Use Reduction?

 
 
 
 

NO.184 The design team has specified products to achieve Materials and Resources Credit: Building Product Disclosure and Optimization – Sourcing of Raw Materials, Option 2. Leadership Extraction Practices for the project. At the end of the construction, it was discovered that the transporter who shipped a portion of the wood did not have chain-of-custody (CoC) certification. The design team should do which of the following?

 
 
 
 

NO.185 A decorative overhead light fixture is specified for a project that costs $1,500 USD and uses recycled water bottles as part of the diffuser shade. The shades are 10% of the overall weight of the fixture and are 50% post-consumer recycled content. Assuming no other portions of the fixture meet sustainability criteria, what would the contributing value of the fixture be?

 
 
 
 

NO.186 In order to meet the minimum qualifications for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification a Commissioning (Cx) agent must have completed the commissioning process activities for a minimum of how many similar projects?

 
 
 
 

NO.187 Which is a benefit of earning Regional Priority credits?

 
 
 
 

LEED-AP-BD-C Dumps are Available for Instant Access: https://www.latestcram.com/LEED-AP-BD-C-exam-cram-questions.html

leave a comment

Enter the text from the image below