Attested HPE7-A03 Dumps PDF Resource [2024]
Latest HPE7-A03 Actual Free Exam Questions Updated 70 Questions
QUESTION 41which documentation resources con be used for finding validated information on Aruba products that assist the architect in building the solution design? (Select three.)
QUESTION 42A global cruise line company needs to refresh its current fleet. They win refresh the insides’ of the ship to be cost-effective and increase their sustain ability. They Mill replace the complete WLAN/LAN hardware of the ship. In this refresh, the company will not refresh Us current security requirements. The CIO also wants to limit the number of unused ports in the switches. Future expansion will always mean a refresh of hardware.They start with the smallest ship with a maximum of 800 guestsEach ship has a LAN infrastructure consisting of two core switches, up to 10 redundant distribution switches, and up to 500 access switches (400 cabins. 100 technical rooms). The Core switches are located in the MDF of the ship and the distribution switches are located in the IDFs of the ship. Each cabin and technical room gets one single access switch.The cabling structure of the ship will not be refreshed. Each IDF is connected to the MDF by SMF. of which two pairs are available for the interconnect between the core and distribution. The length of SM fiber between MDF and IDF is less than 300 meters (930 ft) and the type used is 0S1. Each cabin is connected by a single0M2 pair to the IDF. the maximum length is 60 meters (200 ft). Each technical room is connected by a single0M2 pail to the IDF. with lengths between 100 and 150 meters (320 and 500 ft).For each cabin/technical room the customer is looking to replace their current fan-less 2530/2540 without changing the requirements, except they need to upgrade the uplink to distribution switch to 10GbEto handle the increased network traffic, and the technical rooms need redundant power.The WLAN infrastructure will be 1:1 refreshed without new cabling or new AP locations. Their WLAN Infrastructure is based on the 200/300 series Indoor and outdoor APs running instantOS (less than 300 APs).the customer has no change in WLAN requirements.The cruise line company will replace its current Internet connection before the LAN/WLAN refresh. The new Internet connection will provide a 99.8% uptime, which is needed to ensure the paid guest Wi-Fi is always operational. With this new internet connection, the CIO of the cruise line wants to base the design on the ESP architecture from Aruba because Internet connection is guaranteed.The week after the presentation of your design to the CIO of the cruise line company, the CIO calls you to discuss increasing trie security of the wired network Infrastructure. Since one of their competitors had one of their cruise ships cyber hacked, the CSO of the cruise line has mandated increased security on the wired network. They nave heard about dynamic segmentation and central and decentral overlay networks.What would you advise as the most cost-efficient solution?
QUESTION 43You are responding to the customer’s RFP and are at the point of documenting design decisions that were not specified in the RFP or the RFP questions. What are valid examples of assumptions made that should be presented to the customer during the response? (Select three >
QUESTION 44Which alternative source is best suited for site surveys or simul-ations if no floor plans are available?
QUESTION 45What are the advantages of using a vSX-pair instead of two discrete switches to connect servers, storage, firewalls, and other workloads?
QUESTION 46Based on this campus design, which layer is the most appropriate to be designed as a Border Persona, considering an EVPN VXLAN Fabric?
QUESTION 47A global cruise line company needs to refresh its current fleet. They win refresh the insides’ of the ship to be cost-effective and increase their sustain ability. They Mill replace the complete WLAN/LAN hardware of the ship. In this refresh, the company will not refresh Us current security requirements. The CIO also wants to limit the number of unused ports in the switches. Future expansion will always mean a refresh of hardware.They start with the smallest ship with a maximum of 800 guestsEach ship has a LAN infrastructure consisting of two core switches, up to 10 redundant distribution switches, and up to 500 access switches (400 cabins. 100 technical rooms). The Core switches arelocated in the MDF of the ship and the distribution switches are located in the IDFs of the ship. Each cabin and technical room gets one single access switch.The cabling structure of the ship will not be refreshed. Each IDF is connected to the MDF by SMF. of which two pairs are available for the interconnect between the core and distribution. The length of SM fiber between MDF and IDF is less than 300 meters (930 ft) and the type used is 0S1. Each cabin is connected by a single0M2 pair to the IDF. the maximum length is 60 meters (200 ft). Each technical room is connected by a single0M2 pail to the IDF. with lengths between 100 and 150 meters (320 and 500 ft).For each cabin/technical room the customer is looking to replace their current fan-less 2530/2540 without changing the requirements, except they need to upgrade the uplink to distribution switch to 10GbEto handle the increased network traffic, and the technical rooms need redundant power.The WLAN infrastructure will be 1:1 refreshed without new cabling or new AP locations. Their WLAN Infrastructure is based on the 200/300 series Indoor and outdoor APs running instantOS (less than 300 APs).the customer has no change in WLAN requirements.The cruise line company will replace its current Internet connection before the LAN/WLAN refresh. The new Internet connection will provide a 99.8% uptime, which is needed to ensure the paid guest Wi-Fi is always operational. With this new internet connection, the CIO of the cruise line wants to base the design on the ESP architecture from Aruba because Internet connection is guaranteed.Based on the best practices, what should you recommend as the most cost-effective switch model for the cabins?
QUESTION 48What documents should be included in the solution proposal? (Place the correct items into the list at the right.Order is not important. Not all options will be used)
QUESTION 49What is one use case for designing a 2-tier campus LAM instead of using a 3-tier?
QUESTION 50A large multinational financial institution has contracted you to design a new full-stack wired and wireless network for their new 6-story regional office building. The bottom two floors of this facility will be retail space for a large banking branch. The upper floors will be carpeted office space for corporate users, each floor being approximately 100.000 sq ft (9290 sqm). Data centers are all off site and will be out of scope for this project. The customer is underserved by its existing L2-based network infrastructure and would like to take advantage of modern best practices in the new design. The network should be fully resilient and fault-tolerant, with dynamic segmentation at the edge.The retail space will include public guest Wi-Fi access. Retail associates will have corporate tablets for customer service, and there will be a mix of wired and wireless devices throughout the retail floors. The corporate users will primarily use wireless for connectivity, but several wired clients, printers, and hard VoIP phones will be in use.The customer is also planning on renovating the corporate office space in order to take advantage of “smart office’ technology. These improvements will drive blue-dot wayfinding. presence analytics, and other location-based services The client decided that wired headless devices would be authenticated using Mac Authentication and would have RADIUS attributes sent back to the NAD to assign VLAN and port access parameters to the authentication session on the switch port.What would be critical in making this a successful deployment? {Select two.)
QUESTION 51A global cruise line company needs to refresh its current fleet. They win refresh the insides’ of the ship to be cost-effective and increase their sustain ability. They Mill replace the complete WLAN/LAN hardware of the ship. In this refresh, the company will not refresh Us current security requirements. The CIO also wants to limit the number of unused ports in the switches. Future expansion will always mean a refresh of hardware.They start with the smallest ship with a maximum of 800 guestsEach ship has a LAN infrastructure consisting of two core switches, up to 10 redundant distribution switches, and up to 500 access switches (400 cabins. 100 technical rooms). The Core switches are located in the MDF of the ship and the distribution switches are located in the IDFs of the ship. Each cabin and technical room gets one single access switch.The cabling structure of the ship will not be refreshed. Each IDF is connected to the MDF by SMF. of which two pairs are available for the interconnect between the core and distribution. The length of SM fiber between MDF and IDF is less than 300 meters (930 ft) and the type used is 0S1. Each cabin is connected by a single0M2 pair to the IDF. the maximum length is 60 meters (200 ft). Each technical room is connected by a single0M2 pail to the IDF. with lengths between 100 and 150 meters (320 and 500 ft).For each cabin/technical room the customer is looking to replace their current fan-less 2530/2540 without changing the requirements, except they need to upgrade the uplink to distribution switch to 10GbEto handle the increased network traffic, and the technical rooms need redundant power.The WLAN infrastructure will be 1:1 refreshed without new cabling or new AP locations. Their WLAN Infrastructure is based on the 200/300 series Indoor and outdoor APs running instantOS (less than 300 APs).the customer has no change in WLAN requirements.The cruise line company will replace its current Internet connection before the LAN/WLAN refresh. The new Internet connection will provide a 99.8% uptime, which is needed to ensure the paid guest Wi-Fi is always operational. With this new internet connection, the CIO of the cruise line wants to base the design on the ESP architecture from Aruba because Internet connection is guaranteed.Based on the best practices and customer requirements, what is the correct WUN approach?
QUESTION 52A global cruise line company needs to refresh its current fleet. They win refresh the insides’ of the ship to be cost-effective and increase their sustain ability. They Mill replace the complete WLAN/LAN hardware of the ship. In this refresh, the company will not refresh Us current security requirements. The CIO also wants to limit the number of unused ports in the switches. Future expansion will always mean a refresh of hardware.They start with the smallest ship with a maximum of 800 guestsEach ship has a LAN infrastructure consisting of two core switches, up to 10 redundant distribution switches, and up to 500 access switches (400 cabins. 100 technical rooms). The Core switches are located in the MDF of the ship and the distribution switches are located in the IDFs of the ship. Each cabin and technical room gets one single access switch.The cabling structure of the ship will not be refreshed. Each IDF is connected to the MDF by SMF. of which two pairs are available for the interconnect between the core and distribution. The length of SM fiber between MDF and IDF is less than 300 meters (930 ft) and the type used is 0S1. Each cabin is connected by a single0M2 pair to the IDF. the maximum length is 60 meters (200 ft). Each technical room is connected by a single0M2 pail to the IDF. with lengths between 100 and 150 meters (320 and 500 ft).For each cabin/technical room the customer is looking to replace their current fan-less 2530/2540 without changing the requirements, except they need to upgrade the uplink to distribution switch to 10GbEto handle the increased network traffic, and the technical rooms need redundant power.The WLAN infrastructure will be 1:1 refreshed without new cabling or new AP locations. Their WLAN Infrastructure is based on the 200/300 series Indoor and outdoor APs running instantOS (less than 300 APs).the customer has no change in WLAN requirements.The cruise line company will replace its current Internet connection before the LAN/WLAN refresh. The new Internet connection will provide a 99.8% uptime, which is needed to ensure the paid guest Wi-Fi is always operational. With this new internet connection, the CIO of the cruise line wants to base the design on the ESP architecture from Aruba because Internet connection is guaranteed.The week after the presentation of your design to the CIO of the cruise line company, the CIO calls you to discuss increasing the security of the wired network Infrastructure. Since one of their competitors had one of their cruise ships cyber hacked, the CSO of the cruise line has mandated increased security on the wired network. They have heard about dynamic segmentation and central and decentral overlay networks.What would you advise as the most cost-efficient solution?
QUESTION 53What is the best practice for using VSX at the core of a 3-tier design?
QUESTION 54A large multinational financial institution has contracted you to design a new full-stack wired and wireless network for their new 6-story regional office building. The bottom two floors of this facility will be retail space for a large banking branch. The upper floors will be carpeted office space for corporate users, each floor being approximately 100.000 sq ft (9290 sqm). Data centers are all off site and will be out of scope for this project. The customer is underserved by its existing L2-based networkinfrastructure and would like to take advantage of modern best practices in the new design. The network should be fully resilient and fault-tolerant, with dynamic segmentation at the edge.The retail space will include public guest Wi-Fi access. Retail associates will have corporate tablets for customer service, and there will be a mix of wired and wireless devices throughout the retail floors. The corporate users will primarily use wireless for connectivity, but several wired clients, printers, and hard VoIP phones will be in use.The customer is also planning on renovating the corporate office space in order to take advantage of “smart office’ technology. These improvements will drive blue-dot wayfinding. presence analytics, and other location-based services The client has provided floorplans. wall density, and ceiling heights tor the wireless deployment in the carpeted office space What else will be needed to write an accurate bill of material? (Select two)
QUESTION 55You ate presenting your network design solution to your customer. What Is important to include in your presentation?
QUESTION 56A global cruise line company needs to refresh its current fleet. They win refresh the insides’ of the ship to be cost-effective and increase their sustain ability. They Mill replace the complete WLAN/LAN hardware of the ship. In this refresh, the company will not refresh Us current security requirements. The CIO also wants to limit the number of unused ports in the switches. Future expansion will always mean a refresh of hardware.They start with the smallest ship with a maximum of 800 guestsEach ship has a LAN infrastructure consisting of two core switches, up to 10 redundant distribution switches, and up to 500 access switches (400 cabins. 100 technical rooms). The Core switches are located in the MDF of the ship and the distribution switches are located in the IDFs of the ship. Each cabin and technical room gets one single access switch.The cabling structure of the ship will not be refreshed. Each IDF is connected to the MDF by SMF. of which two pairs are available for the interconnect between the core and distribution. The length of SM fiber between MDF and IDF is less than 300 meters (930 ft) and the type used is 0S1. Each cabin is connected by a single0M2 pair to the IDF. the maximum length is 60 meters (200 ft). Each technical room is connected by a single0M2 pail to the IDF. with lengths between 100 and 150 meters (320 and 500 ft).For each cabin/technical room the customer is looking to replace their current fan-less 2530/2540 without changing the requirements, except they need to upgrade the uplink to distribution switch to 10GbEto handle the increased network traffic, and the technical rooms need redundant power.The WLAN infrastructure will be 1:1 refreshed without new cabling or new AP locations. Their WLAN Infrastructure is based on the 200/300 series Indoor and outdoor APs running instantOS (less than 300 APs).the customer has no change in WLAN requirements.The cruise line company will replace its current Internet connection before the LAN/WLAN refresh. The new Internet connection will provide a 99.8% uptime, which is needed to ensure the paid guest Wi-Fi is always operational. With this new internet connection, the CIO of the cruise line wants to base the design on the ESP architecture from Aruba because Internet connection is guaranteed.Based on best practices, what should you recommend as the correct optic type for the connection between the IDF and the technical rooms?
QUESTION 57Matchthe deployment typeto the estimated numberof APs.
QUESTION 58The clients existing network isexperiencing trouble with voice occasionally dropping out on phone calls between office locations, it Is determined that no packet loss is occurring and QOS is likely the cause. With what phenomenon Is the client currently experiencing issues?
HPE7-A03 Certification Overview Latest HPE7-A03 PDF Dumps: https://www.latestcram.com/HPE7-A03-exam-cram-questions.html
Save my name, email, and website in this browser for the next time I comment.
[Q41-Q58] Attested HPE7-A03 Dumps PDF Resource [2024]
Attested HPE7-A03 Dumps PDF Resource [2024]
Latest HPE7-A03 Actual Free Exam Questions Updated 70 Questions
HPE7-A03 Certification Overview Latest HPE7-A03 PDF Dumps: https://www.latestcram.com/HPE7-A03-exam-cram-questions.html
Related Certifications
Recent Posts
Archives
Categories